Record the starting point
Compare the flat with the specification annex to the purchase contract and with the handover report. With black frame, plaster, screed and services are often missing, sometimes partition walls too. With white frame you start with surfaces, bathroom and kitchen. With green frame, depending on the developer, painting, sanitaryware, kitchen and furniture remain. Photograph every room and every connection before anyone starts.
- 2
Plan and get quotes
A layout shows sockets, switches, lighting, air conditioning, water and drainage points. Add a materials list with brand or grade. Send both to at least two firms so the quotes can be compared. Check the firm in the NAPR business register.
- 3
Sign a works contract
The contract lists the work, with the layout and materials list attached; stages, each with a payment, a photo report and a sign-off; a completion date; the warranty; and a rule that extras count only in writing. Have it translated into a language you read.
- 4
Build in the right order
First add or reroute the runs for power, water, drainage and air conditioning. Then skim walls and ceilings, waterproof the bathroom, lay tiles and floors, and paint. Sanitaryware, kitchen, doors and lights go in last. Have the pipes and cables photographed and measured before they disappear behind plaster.
Final sign-off
Walk the flat with the handover checklist, now applied to the fit-out: hollow tiles, the fall in the shower, sealant joints, every socket, water pressure, doors. Record defects and deadlines in writing and hold back the final payment until they are fixed, if the contract allows it.
Keep the paperwork
File the works contract, invoices, the sign-off report and the photos of pipes and cables. You will need them to pursue defects, to support an insurance claim and, later, when you sell.