White frame, black frame, green frame. The label means little; the contract decides.

In short

White frame, black frame and green frame are market terms for the condition in which a Georgian developer hands over a new-build flat. Black frame is essentially the shell, white frame a prepared interior with plaster, screed, windows and wiring, and green frame one step further. None of them is defined in law. What you actually get is set by the specification annex to your purchase contract.

The stages compared

The advertised 'from' price often refers to the most basic stage a developer offers. Ask for the price of the stage you actually want.

Comparing offers properly

Comparison

Black frame and white frame, item by item.

These two stages sit close together and are easily confused. The overview reflects common market usage. Individual developers deviate from it, in both directions.

Typical market usage, not a legal standard. Your contract's specification annex is what counts.

Walls

Black frame
Shell

Structure and external walls; internal walls missing or bare masonry

White frame
Plastered

Internal walls built and plastered, but not skimmed or painted

Ask whether the partition walls between rooms are already in place. With black frame that cannot be taken for granted.

Floor

Black frame
Bare slab

Concrete slab without screed

White frame
Screed

Screed laid, ready for floor covering

Screed reduces ceiling height. Ask for the clear height once the screed is in.

Windows and front door

Black frame
Often open

Window openings, sometimes glazed, rarely a front door

White frame
Fitted

Windows, balcony doors and a front door

Have the frame profile, glazing and door type put in writing. Offers differ widely here.

Electrics

Black frame
To the door

Supply ends at the floor distribution board or the flat's entrance

White frame
Wired

Cabling inside the flat, back boxes for switches and sockets, consumer unit

Sockets, switches and light fittings are usually not included even in white frame.

Water and drainage

Black frame
In the riser

Connection at the riser, no pipework inside the flat

White frame
Connection points

Pipes to bathroom and kitchen, drainage prepared

Toilet, basin and shower are not part of either stage.

Meters

Black frame
Usually missing

Electricity, water and gas meters not yet installed

White frame
Depends on developer

Sometimes fitted, sometimes applied for after handover

Clarify who applies for the meters and who pays the connection fees.

Air conditioning

Black frame
Not prepared

No conduits, no condensate drain

White frame
Often prepared

Conduits and drain in place, units not included

Prepared pipework saves you cutting into finished walls later.

Fit-out follows handover. A separate guide explains how to plan and supervise it from abroad.

Fit-out from white frame

Three stages

What is missing, what comes next.

Each stage splits work and cost differently between developer and buyer. The less the developer finishes, the more you organise yourself.

Black frame

The shell.

Included
Structure, floor slabs, external walls
Missing
Plaster, screed, wiring, usually windows
Suits
buyers with their own builders on site

White frame

Ready for fit-out.

Included
Plaster, screed, windows, front door, wiring
Missing
Flooring, paint, bathroom, kitchen, internal doors
Suits
buyers who want to choose flooring, bathroom and kitchen

Green frame

Nearly ready.

Included
White frame plus skimmed, primed walls
Missing
Depending on developer: floors, paint, sanitaryware, kitchen
Suits
buyers who want to move in or let soon

Some developers use other names, such as turnkey. What counts is the list in the contract, not the name of the stage.

Put it in writing

What belongs in the specification annex.

Whether the flat is in order at handover is measured against the contract. Anything not written there is hard to claim later.

  1. Walls and ceilings

    Whether all internal walls are built, whether they are plastered, skimmed or painted, and whether the ceiling is plastered.

  2. Floor

    Screed or not, its thickness and the clear ceiling height afterwards.

  3. Windows and doors

    Frame profile, glazing, balcony doors, front door and internal doors, ideally with manufacturer or model.

  4. Services

    Position of the consumer unit, number of circuits, connections for bathroom and kitchen, heating or gas supply.

  5. Meters and connections

    Which meters are fitted at handover and who bears the connection fees.

  6. Air conditioning and ventilation

    Conduits, condensate drains and the positions for outdoor units on the facade.

  7. Show flat as an annex

    Dated photos or a description of the show flat in the agreed condition, signed as an annex to the contract.

Projects in Batumi

New-build projects in Batumi.

For every project, ask for the specification list of the stage the displayed price refers to.

Frequently asked questions

Questions about handover stages.

Meaning, differences, price and what happens when the handover does not match the contract.

What does white frame mean?

White frame is a common handover condition for new-build flats in Georgia: walls plastered, screed laid, windows and front door fitted, electrical and water lines installed. Flooring, paint, bathroom and kitchen are missing. There is no legal definition.

What is the difference between black frame and white frame?

Black frame is essentially the shell, with structure, floor slabs and external walls, usually without plaster, screed or services inside the flat. In white frame that work has been done. Exactly how far a developer goes is set out in the specification annex.

What does green frame mean?

Green frame sits between white frame and move-in ready. Skimmed and primed walls are typical, and depending on the developer also flooring, internal doors or sanitaryware. The term is even less uniform than white frame, so agree every item individually.

Can a flat sold as white frame be handed over as black frame?

Because the terms are not defined, the handover can differ from what you expected. On 16 November 2025 Forbes Polska quoted a buyer in Tbilisi who said he had unknowingly bought a black-frame flat and found out only when his builders arrived. In his words, developers often advertise flats as white frame and sell them as black frame. Your protection is a precise specification list in the contract. If the handover departs from it, have the differences recorded in writing before you sign off the handover.

Does the advertised price per square metre refer to white frame?

Not necessarily. The 'from' price in adverts often refers to the most basic stage the developer offers. Compare offers only at the same stage, and ask what the next stage costs on top.

Last reviewed on 2 November 2026. Sources: Civil Code of Georgia (matsne.gov.ge): law of sale; Art. 183 (written form and registration when acquiring immovable property), Forbes Polska, 16 November 2025: a buyer's account of purchasing in Tbilisi (press report, not an official source). This guide is not legal or tax advice.

Settle the stage first, then compare prices.

A price per square metre means little until you know which condition it buys.